hello | Started date: 28/08/2011
| To Complete In: 15 days
| Time Left: In Archive
Mississauga., Ontario
| Budget: $30,000+
| Bids count: 1
|
Average Bid:
$69100
Description
Quotes invited from specific or general contractors for renovation of a 1800 sq feet back split home.
Description of Work
Unless otherwise stated, the Contractor agrees to supply all materials, labour and supervision to perform the Work as Described below
a. The Work entails the following
Contractor shall use due diligence and precautions for safety , health during execution of this contract. Only use insured and certified workers and carry on the work as per prevalent law, building codes, etc.
Turnkey Renovation of existing bath room on 1st floor.
Remove and dispose existing Tiles, dry walls, bulk head, toilet, tub, vanity, base board, flooring etc.
Supply and install top quality 1 piece Toilet, sink, tub, vanity with granite or quartz counter top, bathroom fog free mirror, cabinets plumbing faucets, showers, light fixtures, high efficiency exhaust fan with light and other fixtures, organizers and accessories after approval from the owners.
Supply and Install dry walls, additional power sockets and water tight light fitting on tub enclosure celling,
Supply and install travertine or comparable quality tiles as approved by owners for walls ( Ceiling Height around bath tub and from floor to50 inch on all walls ) , floor and back splash with accent tiles and pattern
Supply all required material to complete the bathroom with approved paint crown molding and sealants.
Cut out and finish for linen shoot as discussed.
Ensure the floor level of remains same after renovation.
Any other material or work to complete the job.
Turnkey Renovation of Powder Room
Remove and dispose existing Tiles, dry walls, toilet, vanity, base board, flooring etc.
Supply and install top quality 1 piece Toilet, sink, tub, vanity with granite or quartz counter top, bathroom fog free mirror, plumbing faucets, light fixtures, high efficiency ductless exhaust fan with and other fixtures and accessories after approval from the owners.
Supply and Install dry walls, additional power sockets.
Supply and install travertine or comparable quality tiles as approved by owners for walls (Floor to50 inch on all walls ) , floor and back splash with accent tiles and pattern
Supply all required material to complete the bathroom with approved paint crown molding and sealants.
Ensure the floor level of remains same after renovation.
Any other material or work to complete the job.
Turnkey Kitchen Renovation
Remove and dispose existing Tiles, dry walls and cupboards, counter, sink, base board, flooring etc.
Supply and install cabinets from with crown moldings , under cabinets skirting and lighting.
Supply and install all door, cabinet drawer handles/ knobs and organizers for cupboards and drawers.
All cabinets must have slow close mechanism.
Supply and install travertine or comparable quality tiles as approved by owners for walls, floor and back splash with accent tiles and pattern. Please note to remove railings before laying the tiles and reinstall after floor is ready.
Supply and install 12 pot lights.
Provide electric outlets for stove, exhaust, microwave, dishwasher and under counter lighting.
Provide plumbing for refrigerator, dishwasher and sink.
Make provision taking out kitchen exhaust through roof or existing location as per code and safety.
Supply and install approved granite or Quartz counter top with under mount sink.
Supply and install approved pocket door with glass.
Remove and install existing light fixtures in kitchen to family room as explained.
Provide for natural gas line for stove by licensed and insured technician.
Supply all required material to complete the kitchen with approved paint crown molding and sealants.
Ensure the floor level of remains same as per adjacent area after renovation.
Any other material or work to complete the job.
Replace all internal doors.
Stairs and Railings
Sand and polish railing and stairs for approved finish.
Repair squeaking steps and loose railing.
Paint railing grill in matt black.
Family Room.
Box fire mantle with dry wall..
Provide and install approved gas fire place with enclosure.
Licensed technician to make provision for gas connection.
Make provision for installation of flat screen TV and speakers.
Remove existing wall panels and dispose.
Remove wall lights and install in powder room. Provide and install approved light fixtures.
Flooring
Repair all squeaking floors.
Remove all existing vinyl flooring and dispose.
Level and finish floors for installation of flooring for whole house.
Supply and install flooring for whole house as per owners approval.
Painting
Prepare, supply and paint whole house as per approval of owners.
Base Boards
Supply and install base board for whole house.
Main Electric Panel
Supply and install and code 100 amps updated main panel by licensed and insured electrician.
Electric
Contractor shall change all electric switches and sockets.
Contractor will replace door bell and door bell switch as supplied by owners.
Plumbing
Supply and install main shut off valves, kitchen, Main bathroom and powder room.
Clean up and disposal
Contactor will be responsible for though clean up and disposal of waste, packing material etc.
Contractor shall clean all exhaust vents and ducts upon completion of work.
Exterior.
Check and repair any leaks in foundation.
Tree trimming
Inspect and repair down pore pipe, weeping tiles.
Land- scaping
Fence repair/ replace and paint.
interlocking
Further details to be discussed
Thank you
| Choose the appropriate status for this project: | Ready to Hire |
| What kind of location is this? | Home/residence |
| Are you the owner or authorized to make property changes? | Yes |